Lanca Contracting  








  Project History
Updated: 12 November 2009

Click images to enlarge.
 
Industrial - Commercial - Institutional - Government - Recreational - Multi Tennant/Residential
  Industrial
J.P. Bowman Limited, Phase 2
Sinclair Blvd., Brantford, ON
Design and construction of a 40,700 sqft industrial addition consisting of a two level upscale office area and a 30,000 sqft pre-engineered production facility.

J.P. Bowman Limited       J.P. Bowman Limited
Lancashire Development Ltd.
Bury Court, Brantford, ON
The building is a pre-engineered single slope with stucco and architectural concrete block facade. It has anodized aluminum tinted windows, paved asphalt parking and professional landscaped facilities. This 27,000 square foot Industrial Multi-tenant facility is ready for lease. more information
Lancashire Development Ltd.
Millfab Industires
477 Ofield Road, Dundas, ON
Working with Tacoma Engineering, this 6,000 sq ft pre engineered building is an addition to a 2004 structure built by Lanca. The new addition will have a 5 tonne crane, translucent light panels with an interior liner, fire protection tanks and additional parking to facilities.
Blastech Corporation
57 Old Onondaga Road, Brantford, ON
This three quarter million dollar, pre-engineered 12,000 sq ft building will house the compressor facilities complete with a climate control system. Renovations also include two building additions complete with two crane runways for class D crane systems and large overhead doors.
Blastech Corporation

Blastech Corporation
Haggerty Industrial Condominiums
Phase I & II

20 Roy Blvd., Brantford ON
Lanca was awarded the contract for the design and construction of these Industrial Condos. The two projects total over 87,400 sq. ft. and construction consists of conventional steel structure, built up roofing system, and stucco facade exterior in combination with aluminum glazing.
Haggerty - Industrial Condominium

Haggerty - Industrial Condominium
Blossom Ave Investments
Zatonski Avenue, Brantford, ON
Design and Construction of a 33,500 sqft industrial mall for lease. Minimum unit size is 9,600 sqft. For more information see the leasing opportunities page.


Blossom Ave Investments
Industrial Building For Lease
Hardy Road, Brantford ON
This is a new 10,000 square foot manufacturing/warehouse facility. It is a Robertson Pre-Engineered building complete with architectural block and stucco front. Job complete except for Spring work.
Blossom Ave Investments
Ryan Place, Brantford ON
This 27,700 square foot Industrial Mall is a Robertson Pre-Engineered building with unit sizes of 3,450 square foot. The building is a 20' eave height with the front stucco complete with commercial windows and entrances. There is a 12' x14' overhead door with loading dock and leveller in each unit. It has a minimum 100 Amp/600 Volt sub service. The parking lot is paved at the front with reclaimed asphalt in the shipping and receiving areas.
Blossom Ave Investments
TACO Communications
Sharp Road, County of Brant
This is a new 50,000 sq.ft. head office and manufacturing/warehouse facility. This is a Robertson pre-engineered building with 18' eave height, 5 span framing and standing seam roof with interior liner. The office area is 4,000 sq.ft. conventional construction, architectural block with pre-finished metal canopy. It consists of Duranar finished aluminum windows and tinted glazing.
TACO Communications
Nick Rizzo
Brantford, Ontario
Lanca Contracting won this contract for the new home of BML Multi Trades. They will lease these new premises from Nick Rizzo to be located at the end of Ryan Place, Brantford. This 20,000 sqft pre-engineered office/production facility will be BML's new head office. The building will consist of a 2 storey office with stucco exterior finish and aluminum framed glazing.
Nick Rizzo
Rothsay Recycles (div. of Maple Leaf Foods)
Hwy # 5, Dundas
16,000 sq.ft. Trailer storage building.
Lanca was hired to provide the design/build service for this project consisting of a Robertson pre-engineered building supported by 25' steel pile construction below grade to bedrock.
Building is complete with insulated walls and pre-finished metal liner.
Rothsay Recycles
Oakrun Farm Bakery Warehouse
58 Carluke Road W., Ancaster, ON
Contract Price $2,100,000.00 plus mech/elec work - 21,000 sq.ft. 10E freezer, 2,400 sq.ft. Loading dock. The project was executed as design-build by Lanca Contracting. The freezer walls consist of 10" Zer-O-Loc wall panels and the roof has an R40 roof system. The four(4) door loading dock addition is complete with standup dock levellers, inflatable dock seals, and truck restraints. Offices, lunchroom and mechanical room will be constructed above dock area. In early 2008, Lanca completed a 3200 sq. ft. addition. This project is a steel structure complete with metal siding. It has a 4 ply built up roof, concrete slab on grade with machine bases. The space is completed with plumbing, heating and air conditioning.


Oakrun Farm Bakery Warehouse
Paul Davis Systems
37 Copernicus Blvd, Brantford, ON
this 7,500 sq ft addition consisted of remodelling the existing facilities to provide an office and warehouse addition for a production/staging area. The addition consists of block and stucco finish on the exterior complete with structural steel roof construction and 4 ply built up roofing.
Keith's Walking Floors International
65 Bury Court, Brantford, ON
This is a 22,600 sq ft, 1.8 million dollar design - build project. The facility consists of a pre-engineered structure for the plant area and conventional office construction, the 30’ high plant houses two 5 ton cranes. The office includes a lunchroom, washrooms, change rooms, reception, board room and private offices. The exterior is dressed with paved parking and a professional landscaping design.
Canweld Metal Products Inc.
Burford, ON
Canweld Metal Products Inc. selected Lanca Contracting to design and construct their new 26,650 sqft industrial facility. The building consists of an attractive colored architectural block office area facing the street. The production area will house two 5 Ton crane bays running the entire length of the building.
Canweld Metal Products Inc. Canweld Metal Products Inc.
Lansdowne Developments
Woodstock, ON
15,000 sqft pre-engineered design/build addition to Industrial Mall

Lansdowne Developments Lansdowne Developments
David Wilson Machine (Wiltech Welding)

Phase 1 complete in 2002

75 Adams Blvd., Brantford, ON
20,000 sqft Robertson Building / Conventional office structure.

Phase 2 complete in 2004
Design and construction of a 20,000 sqft pre-engineered industrial addition. This second phase addition will house production and warehousing space as well as new lunchroom and washroom facilities.
David Wilson Machine

David Wilson Machine
Regional Hose Woodstock Ltd.
Bysham Park Drv., Woodstock, ON
Design and construction of an 18,000 sqft
Pre-engineered industrial Plaza complete with up to 9,000 sqft of leasable space.
Regional Hose Woodstock Ltd.
Germiphene
Brantford, ON
20,000 sqft Robertson Building complete with 3,000 sqft precast mezzanine.
 
Ambeau-Amos
Sinclair Blvd, Brantford, ON
12,000 sqft pre-engineered building. New industrial production facility complete with office space and future second floor office space.
Ambeau Amos
John G. Wilson Machine
Third Concession Road, Princeton, ON
Design and construction of 25,000 sqft pre-engineered building addition to existing buiding. Pre-engineered building is complete with R.T.S. roof system and prefinished metal siding on exterior and interior liner.
Cayman Manufacturing
Brantford, ON
28,000 sqft design/build industrial mall
Brantford Bus Terminal
Kings Wood Products
Paris, ON
Pre-engineered building - original built in 1982 (12,000 sqft), addition of 8,000 sqft in 1995, addition of 20,000 sqft in 1997, which includes a 10 ton crane and 2,500 sqft, two storey office section, exterior loading docks, sprinklers.
Brantford Bus Terminal
Culligan
Woodstock, ON
14,000 sqft industrial building, head office for regional distributor
Culligan Water Treatment

-top-
  Commercial
Dr Vos
108 St. George Street, Brantford ON
Leasehold improvements to a Medical Plaza was done to accommodate a new Dentist’s office. Dr. Vos required 1,400 sq ft of work consisting of walls, floors, ceiling, plumbing etc. for his new Dental practice.
Itech Precision Cleaning
73 Sinclair Blvd., Brantford ON
Construction of a second floor facility including office, a new boardroom, washrooms and a central utilities area was need in the 1,800 sq ft renovation for this company.
Itech Precision Cleaning
Agropur Distribution Centre
21 Intrepid Drive, London, ON
This $1.8 million, 14,000 sq ft pre-engineered building is a new refrigerated distribution centre for Agropur Canada. It has 4”/6” insulated panel cladding and Robertson RTS roof system. The facility will house new finished office space, dispatch areas and a driver's lounge.
Agropur Distribution Centre
Marritt Hall, Ancaster Agricultural Society
630 Trinity Road, Ancaster, ON
This five and a half million, 40,000 sq. ft. Convention Hall and Administration Offices are being developed for the new Ancaster Agricultural Society grounds at the corner of Trinity road and Wilson Street. This is a two storey building to house the administration office of the Society comprised of heavy timber construction inside the convention hall with perimeter coloured architectural block. The service areas and administration is full frame construction complete with precast second floor with a prefinished standing seam roof. There is pre finished hardi board exterior, wall finish complimented by stonework. There is also a passenger elevator to the second floor.
Marritt Hall, Ancaster Agricultural Society
Six Nations Bingo Hall
The construction of a new Bingo Hall will have Lanca Contracting supplying a Pre-Engineered Building complete with a 2 storey front entrance mezzanine. The exterior will be block walls and metal siding with aluminum windows.
Chin Tai Ginseng
Windham Centre, ON
Working with MC Engineering, this pre-engineered building will be the new home for a ginseng processing plant. The building will have metal siding on walls, front entrance canopy complete with aluminum windows, a large second storey mezzanine for offices and staff area. The ground level will house production and processing.
Chin Tai Ginseng
Millard, Rouse & Rosebrugh
Nelson Street, Brantford, ON
Lanca Contracting will be starting this 30,000 sq.ft. 4-storey office complex. This is a full frame steel structure, pre-cast concrete floor slabs, the exterior is brick, Structural steel studs, insulation and drywall. The roof consists of wood trusses, plywood, built up roof, perimeter wood trusses to create sloped roof complete with asphalt shingles. The interior has a 2-storey entrance foyer and reception area with upgraded interior finishing.

Millard, Rouse & Rosebrugh Millard, Rouse & Rosebrugh
Rendez-Vous Restaurant
Brantford, Ontario
Brantford's next fine dining restaurant will be "Rendez-Vous" located inside the new Brantford Civic Square phase 1 building now nearing completion. The restaurant will house a fine dining room, bar, kitchen and prep facilities. Design was provided by Allen-Chui Architects and construction is scheduled to begin in May, 2006.
Rendez-Vous Restaurant
Temple Building
76-86 Dalhousie Street, Brantford, ON
Lanca Contracting is the Project Manager of this 23,000 sq.ft. 2nd & 3rd floor renovation with a budget of $2,000,000.00. This is an existing 3-storey complex in the downtown core with complete renovations to 2nd and 3rd floors for 25 apartments with new fire exits. The 3rd floor contains some loft apartments with vaulted ceilings. The exterior is to be finished to original Heritage appearance.
Temple Building
Dost Plaza
625 Park Road North, Brantford
Contract Price $1,050,000.00 - 15,000 sq.ft.
This design-build commercial project is an attractive office building offering three(3) 5,000 sq.ft. Units or up to six(6) 2,500 sq.ft. Units for lease. This building uses conventional steel construction, architectural block and stucco finishes. The arched aluminum windows are complete with grilles. The building is scheduled for completion in December 2005.
Oakville Dental
Oakville, ON
Three story professional building for dentistry - brick, poured concrete floors on metal pan and open web steel joists.
Oakville Dental
Amberlea Place
Brantford, ON
Three storey, 50 unit, retirement home complete with administration, kitchen and entertainment facilities.

Amberlea Place       Amberlea Place
Culligan Water Treatment
Lynden Road, Brantford, ON
Award Winning Design
13,100 sqft commercial building.


Culligan Water Treatment
Culligan Water Treatment
Flim Flam Gift Gallery
Lynden Road, Brantford, ON
19,000 sqft commercial building.
Flim Flam Gift Gallery
Charing Park Plaza
Brantford, ON
3,600 sqft commercial building, conventional contruction - design/build project

Charing Park Plaza       Charing Park Plaza
Fast Eddie's
Brantford, ON
Drive-thru only restaurant complete with two drive-thru's, painted architectural block walls on exterior, conventional construction.
Fast Eddies

-top-
  Institutional
Bellview Public School
97 Tenth Ave, Brantford ON
Lanca successfully bid to work with The Ventin Group with a 1,700 sq ft library addition and renovations to 4,000 sq ft of classrooms. The Owner, the Grand Erie District School Board will enjoy usage of their new facilities by August 31, 2009 in time for the new school year.
Bell Lane Group Home (Brantwood Residential)
25 Bell Lane, Brantford, ON
Lanca was the successful bidder on this proposed group home designed by SRM Architect. Construction has begun and completion is scheduled for February 2009. The building will provide supervised housing for handicapped adults.
Bell Lane Group Home
St. Basil's Rectory Renovation
50 Palace Street, Brantford ON
Lanca Contracting will be working as Project Manager with MMMC Architects to renovation of the existing Rectory will consist of demolition of a portion of the building, replacing the roof, building new walls, floors, a roof and various finishes. There will also be a remodel to the second floor for living quarters, administration offices and meeting rooms.
Church of Jesus Christ of Latter-day Saints
195 Victoria St., Simcoe ON
The renovation of the existing Church consists of an additional 3,735 sq. ft. and will be wood framed walls and roof, brick and stucco on the exterior finish. Work will consist of adding a multi-purpose room and office, as well as extending the parking lot.
Church of Jesus Christ of Ladder-day Saints
Grace Anglican Church, St. Stephen's House
Albion St., Brantford ON
The renovations to this existing home consists of demolition, removal and disposal. The reconstruction of the existing space is to establish student bedrooms throughout the house and in the attic space.
Calvary Pentecostal Church
Broad St., Dunnville, ON
Design and construction of a Pre-engineered recreational facility addition. The addition houses new offices, nursery, washroom facilities and gymnasium. The building is over 13 thousand sqft complete with a 3600 sqft precast concrete mezzanine for activity viewing.
Calvary Pentecostal Church
Notre Dame Catholic School
Caledonia, ON
8,000 sqft conventional school addition designed by Venerino V.P. Panici Architects Inc. Construction consists of two 4000 sqft single storey classroom additions.

Notre Dame Catholic School

-top-
  Government
Mountview Cemetery
80 Blenheim Rd., Cambridge ON
Working with The Ventin Group, Lanca will be completing construction of a 800 sq ft garage and renovation to 4,000 sq ft to the existing storage building. Work is anticipated to be completed by mid September.
Chemical Storage Building
396 Cedar Street, Simcoe, ON
Lanca is working with G. Douglas Vallee on this 2,500 sq. ft. pre-engineered building is to be used by the City of Norfolk. The facility will include finished office space, a chemical storage area and trench bay, washrooms, locker rooms and a second floor meeting room.
Chemical Storage Building
Brantford City Hall
Brantford, ON
Installation of new exterior handicapped accessible concrete ramp. Major alterations of existing clerk's department, engineering department and council chambers. New Auditel Conference System to be installed for use during city council meetings.

Brantford City Hall Brantford City Hall
Darling Court
Brantford, ON
Brant County Court House complete with courtrooms, prisoner areas and administration - 2 phases (62,000 sqft)
Darling Court -- Brant County Court House

-top-
  Recreational
The Athletic Club
595 West Street, Brantford ON
The renovations of the 14,000 sq ft space, along with a 6,000 sq ft addition to this facility includes adding a women's only entrance and workout space, the addition of a swimming pool and squash courts and the change rooms will be remodeled and enlarged. There will also be an addition of a family change area.
New "YMCA" Facility
143 Wellington Street, Brantford
Contract Price $1,050,000.00 - 18,600 sq.ft.
Lanca was Awarded this complete renovation to an existing "Brownfield" industrial building both inside and out. Construction consisted of all new site services, outdoor parking, new curtain wall windows with reflective glass and all interior finishes. The exterior of the building received a stucco finish. Interior layout incorporated new administration offices, change rooms, work out areas, and cardio area.
YMCA Brantford

YMCA Brantford
Brantford Jaycee's Sports Centre
Brantford, ON
approximately 2,500 sqft wood frame and wood siding, partial 2nd floor, concession area, washrooms and meeting room.
Brantford Jaycee's Sports Centre

-top-
  Multi Tennant/Residential
G.K. York Developments
Brantford, ON
This Project Management job will have Lanca working to build two (2) two storey triplex units, and adding a second storey to an existing commercial building to provide residential units to the complex. The buildings will be wood framed complete with vinyl siding and stucco; asphalt shingle roof and a common asphalt parking lot.
Medical Office Rental Units
108 St. George Street, Brantford ON
This strip mall will have four rental units being designated for medical offices/services. The 5,400 sq. ft. addition will compliment current facilities used by a local optometrist. The building is to be block and framed walls with stucco and block on the exterior. The 4 ply built up and steel framed roof will cap off the interior of drywall walls, T-bar ceilings and separate plumbing, HVAC and electrical per unit.
Dr. Vos
Triplexes/Renovations
163 Market Street, Brantford, ON
Lanca was the Construction Manager for G. K. York Management to oversee the completion of this project. It consists of three buildings. Building #1 is a second storey addition of three rental apartments. Building #2 and 3 are identical triplexes complete with paved parking and landscaped amenity space.
Brantford Civic Square Phase III
Dalhousie St. Brantford ON
This four storey commercial/residential building is aesthetically complimenting to the other two Civic Square Buildings to create an impression in the downtown core. This is a full frame structure complete with open web steel joists, a metal deck roof, and precast concrete floors. The exterior is mostly brick, with stucco accents. The four stories consist of the first floor being commercial and the second to fourth for residential.
Brantford Civic Square Phase 2
Between Dalhousie Street & Colborne Street, west of Market Street, Brantford
Lanca is providing a project management service contract for this project at an estimated cost of $3,500,000.00. This new four(4) storey complex contains leasable commercial space on the ground floor for future tenants. The 2nd, 3rd, and 4th floors house a combination of one and two bedroom apartments with balconies. The building exterior utilizes brick, stucco and glass finishes. All new residential apartments are complete with separate hydro, heating and air conditioning services. The residential area, 2nd 3rd and 4th floors are complete.

Civic Square Phase II Sushi Bar
This 1,300 sq ft space will house an eat in/takeout Sushi Bar. The dining experience will be heightened by the porcelain tile floors, painted walls and a T-Bar ceiling with drywalled bulkheads.
Brantford Civic Square

Brantford Civic Square
Brantford Civic Square Phase 1
Between Dalhousie Street & Colborne Street, west of Market Street, Brantford
Lanca is providing a project management service contract for this project at an estimated cost of $4,600,000.00. This new four(4) storey complex contains leasable commercial space on the ground floor for future tenants. The 2nd, 3rd, and 4th floors house a combination of one and two bedroom apartments with balconies. The building exterior utilizes brick, stucco and glass finishes. All new residential apartments are complete with separate hydro, heating and air conditioning services. Construction is underway on the east side of this lot.
Brantford Civic Square
Dost Student Residence
Downtown (Core) Brantford
Lanca Contracting has been awarded the contract for the design and construction of this 14,200 sqft student residence. The four story student residence is complete with main floor commercial space. The building front will consist of a combination of brick and stone. Completion is scheduled for September 2004.
Dost Student Residence
Rizzo Student Residence for Wilfrid Laurier University
Colborne Street, Brantford, ON
Construction of a four storey 16,000 sqft building consisting of wood framed construction between two existing buildings in the downtown core. Exterior of building to have a combination stone, brick and stucco fascade. Interior walls and ceilings to be painted drywall. Floors to receive vinyl tile or carpet finish.
Rizzo Student Residence - Wilfrid Laurier University

-top-